
Add to Cart
Adjustable Waste Water Treatment Equipment , Blue Air Flotation Machine
■ Introduction
This series of water purification devices collect the essence of flocculation, sedimentation, sewage, backflushing, water collection and filtration and other processes. It is a series of water purification devices that can achieve fully automatic operation of monomers without human operation. It is an important unit to realize automatic management of water plants. , The water purification device has the advantages of wide application range, good treatment effect, excellent water quality, short construction period, small area, and investment saving.
Parameters
Type | AF-1 | AF-5 | AF-7.5 | AF-10 | AF-15 | AF-20 | AF-30 | AF-40 | |
Capacity m³/h | 1 | 5 | 7.5 | 10 | 15 | 20 | 30 | 40 | |
Equipment No. | 1 | 1 | 1 | 2 | 2 | 2 | 3 | 4 | |
Sludge Absorb | 1.8 | 9 | 14 | 18 | 27 | 36 | 50 | 82 | |
Contact oxidation tank(m3) | S.0 | 24 | 36 | 44 | 63 | 83 | 130 | 170 | |
secondary sedimentation tank surface load (m³/m²h) | 1.2 | 1.3 | 1.3 | 1.2 | 1.2 | 1.5 | 1.5 | 1.5 | |
disinfecting tank(m³) | 0.6 | 2.8 | 4 | 5.5 | 8 | 10 | 15 | 20 | |
Blower | HC-25IS | HC-50C | HC-50IS | HC-60IS | HC-80S | HC-100S | HC1-100S | HC-100S | |
Power(kw) | 0.4 | 1.5 | 2.2 | 2.2 | 3.7 | 5.5 | 5.5 | 5.5x2 | |
No. | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 3 | |
Pump type | AS10-2CB | AS16-2CB | AS30-2CB | ||||||
Power(kw) | 1 | 1.6 | 2.9 | ||||||
Heaviest Set(t) | 5 | 7 | 10 | 8 | 10 | 10.5 | 10.5 | 10.5 | |
Total Weight(t) | 5.5 | 8 | 11 | 17 | 20 | 21 | 29 | 38 | |
floor space(m²) | 6 | 20 | 30 | 50 | 65 | 75 | 115 | 155 |
■ Application
The integrated water purifier is suitable for water purification in rivers, rivers, lakes, reservoirs and other water supply projects that use surface water as the water source, reclaimed water reuse, and coal mine tailings water, coal washing water, baths, swimming pools, car washes, papermaking , Printing and dyeing, electroplating and other industrial wastewater purification.
■ Working Principal
The purification process of the integrated water purification device is the same as that of the urban water supply plant. It has coagulation tank, sedimentation tank, filter tank, water quality stabilizing device, backwashing device, water pump and electrical control cabinet. Now they are introduced as follows
1. The raw water into which the coagulant is added to the coagulation tank is stirred by a mixer in the water inlet coagulation tank, so that the suspended solids in the water and the coagulant fully react to form rock flowers. A general water purification device uses a vortex reaction to mix the water and the coagulant, but the effect is unstable due to changes in the amount of water. The water purification device is mixed with a mixer, and the effect is not affected by changes in water volume.
2. The water in the sedimentation chamber is coagulated by adding coagulant to form rock flowers and flows into the sedimentation tank of the equipment for precipitation. The sedimentation tank adopts the inclined tube sedimentation method, and the solid-liquid separation is completed through the trapezoidal inclined plate sedimentation chamber. Mud bucket.
3. The sedimented water flows from the filter tank to the filter tank for filtration. The bottom of the filter structure is a water pipe, the middle part is quartz sand, and the upper part is anthracite. The filtration speed is 10m/h, and the clean water flows into the clean water tank for disinfection treatment before drinking. The recoil cycle of the filter tank is about 12 hours, and the recoil time is 5-10 minutes.
Combustion process and brief description:
The waste is manually put into the primary combustion chamber of the furnace body, and the automatic temperature control starts the primary combustion. According to the principle of combustion three T (temperature, time, vortex), it is fully oxidized, pyrolyzed and burned in the furnace body combustion chamber. The flue gas produced by incineration enters the second combustion chamber, and the unburned harmful substances in the flue gas are further destroyed in the second combustion chamber. In order to completely decompose the unburned embers and meet the emission requirements, the second combustion chamber is equipped with a burner to assist combustion, and is equipped with a unique secondary air supply device to ensure that the flue gas is in full contact with oxygen at high temperatures, and at the same time to ensure that the flue gas is in the second combustion chamber. The residence time of the combustion chamber is adjusted according to the oxygen content of the flue gas at the outlet of the second combustion chamber. The temperature in the second combustion chamber is controlled and the larger particles are removed by the dust collector, so that the incineration efficiency and destruction removal rate can reach more than 99%, so that it can achieve the effect of no odor, no odor and smoke, and reach the national emission standard. It enters the chimney and is discharged into the atmosphere, and the ashes produced after combustion are manually taken out, screened, transferred and buried.
Why Choose Us?
1. Longdai has more than 10 years of experience in wastewater and sludge treatment.
2. We introduce German technology, thus our product is much better than other Chinese manufacturers.,
3. We have our own R&D center and complete manufacture system.
FAQ:
Q: Do You Provide OEM Service?
A: Yes. We Can Do The Customized Design According To Your Different Request for sludge Dewatering.
Q: How About The Production Capacity Of Your Company?
A: Our Factory Covers Area Over 15,000m² And Produces Machines 2000 Sets Per Year.
Q: How Could We Trust You And Your Company? Is This Your First Time Transaction?
A: A: Our Company Has More Than 20 Years Professional Experience. We Cooperate Over 800 Customers in China And Overseas. We Export Nearly 60 Countries All Over The World. And We Have More Than 60+Patents, CE,ISO 9001,SGS Certificates.
Q: Do You Offer After-Sales Service?
A: Video Technical Support, Online Support,Spare Parts, Field Maintenance Repair Service
Q: How Long is Your Warranty?
A: 2 Years After The Arrival Of The Goods. During This Period, As Long As It Is Not a Man-Made Damage, We Send The Damaged Parts Free Of Charge.
Q: What About Your Produce Time? What Kind Of Transportation Do You Offer?
A:Within 30 Days Against Down Payment. Air, Land & Sea .
Q: What Kind Of Payment Do You Accept?
A: T/T, L/C, Paypal, Cash, D/P, D/A, Unionpay